The Bonny Non-associated Gas (NAG) Project is a greenfield onshore gas field development project in Rivers State, Nigeria. It includes a treatment plant with 600 MMscf/d capacity, a 10 km 14“ raw gas pipeline, a 1.6 km 16“ export pipeline to the Bonny Nigeria Liquid Natural Gas (NLNG) plant and 1 MW power generation.
In the first phase the gas plant was designed to treat 300 MMscf/d. In the second phase the capacity of the plant was extended to 600 MMscf/d. First gas was delivered on schedule. IMPaC provided integrated project development and advanced process automation applying cutting edge Foundation Field Bus technology. Efficiency and adequacy of safety and control functions were checked during the design stage by ’Instrumented Protection Function’ procedures.
Scope of Work:
Basic Engineering Design
Detailed Engineering Design
ITT for Construction Tender
Procurement Assistance
Construction Supervision
Commissioning
IMPaC‘s Services:
50 000 hours