EP CM 5000 MT Ammonia Tank, Boil off system, flare system and interconnection of new systems.
Scope of work:
Tank design and engineering
Basic- and detail piping engineering, incl. stress calculation
Basic design for external steel structure, roof platform, stair tower and pipe rack
Civil engineering
Design of BOG
Design of Flare
Interconnection
Procurement and Delivery of all material
QA/QC engineering
Supervision at site