NEXT ENERGY

Kavian

Work Scope:

EPCM

2x 32.000m³ Ethylene Tank

2x 18.000m³ Ethane Tank

Engineering:

Detail Engineering including seismic dynamic analysis by Finite Element Method

Tank insulation

Process piping design and basic engineering Procurement 

Prefabrication of Material

Delivery of material DAP Site 

Construction:

Preparations of Inspection and Test Plan

Preparation of Hydrotest Procedure

Welding and quality plan

Erection manual

Site Supervision during complete Construction

 

Next Reference
NEXT ENERGY