Kuzey Marmara Field Development

The Kuzey Marmara Field is located in the gas-rich Thrace-Gallipoli Basin in the Sea of Marmara. IMPaC provided engineering and project management consultancy services for the design, fabrication and installation of TPAO’s Kuzey Marmara production platform (not normally manned) and associated pipelines in 43 m water depth. The gas production platform is a 4-legged jacket with inclined skirt piles with the following weights: (1) Jacket: 482 t, (2) Topside: 160 t and (3) Piles: 4 piles, 108 t each. The associated 8” subsea gas pipeline and 2” glycol injection line between the platform and the onshore facilities run over a distance of 2.5 km.

 

Scope of Work: 

Project Management

Engineering Consultancy

Site Engineering

Construction & Installation Supervision

 

IMPaC‘s Services:

10 000 hours