SPG Steiner performed the execution of1*4.500 LNG Sphere for Westfarmers Gas Ltd, Australia in June 2006. The Scope of Work included Engineering, Procurement and Site Supervision as well as Mechanical design and Calculation of the Sphere. Further, SPG STiener completed Insulation Design and Delivery with special spring support design. Based on the above, Prefabrication and Delivery of Material along with Supervision was done.
Scope of Work:
Engineering; Procurement and Site Supervision
Mechanical design and Calculation of the Sphere
Insulation Design and Delivery
Prefabrication and Delivery of Material,
Supervision