Offshore Accommodation Platform „Dan Tysk“ II

Scope of Work:

Consultancy services for the installation phase including update of drawings, refinement of FE calculations with specified installation procedures, update of installation drawings

Development of monitoring concept (together with WTM Engineers) for operation phase

As-builts: Update of design drawings (P&IDs), verification of as-built status (foundation piles, grouted connections)

 

IMPaC‘s Services:

3 500 hours